Trapezoid trench section times measured run length.
Also computed
10.0% bedding allowance added.
10.0% import allowance added.
Loose spoil after swell, minus retained native backfill needed for compaction.
Excavation volume minus pipe displacement.
Bedding-zone volume before waste, limited by trench depth if needed.
70.0% of remaining compacted backfill.
25.0% swell applied to excavation volume.
Negative clearance means the entered pipes do not fit the bottom width.
Compare with the entered bedding cover above the pipe crown.