Use slope mode when the required pitch is known. Use invert mode when start and end elevations are measured.
Horizontal run length along the pipe layout, not the sloped pipe centerline length.
Slope as fall divided by horizontal run times 100. 2.083% equals 1/4 in per foot.
Gravity drains usually fall from start to end. Use rise only for an elevation comparison or non-gravity layout.
Invert elevation at the upstream or starting point. The datum can be arbitrary if only the relative change matters.
Measured downstream or ending invert elevation.
falls from start to end
Also computed
1:48.0
Powered by MachineCalcs ↗