Chvorinov Solidification Time Calculator

Net casting volume. Internal chills, cores and feeders should be handled by your foundry method, not hidden here.
cm³
Effective heat-transfer surface area for the casting section being screened.
mm²
Trial riser volume for a relative solidification-time check.
cm³
Effective riser cooling area. Exclude insulated or contact areas according to your foundry method.
mm²
Empirical Chvorinov constant for the alloy, mold material, superheat and process. The modulus is evaluated in cm even when dimensions are entered in imperial units.
s/cm^n
Chvorinov exponent, commonly close to 2 for first-pass casting screens.
Desired riser solidification time divided by casting solidification time.

Results

Default result
Edit inputs
Riser time ratio(t_r/t_c)
2.37
Pass

Also computed

Casting modulus(M_c)12.50mm

Casting time(t_c)3.13min

Riser modulus(M_r)19.23mm

Riser time(t_r)7.40min

Required riser modulus(M_req)13.98mm

Riser modulus margin(M_r - M_req)5.26mm

Method notes 3 notes
  • Uses casting modulus M = V/A and Chvorinov time t = B * M^n with M evaluated in cm.
  • Riser comparison assumes the same empirical B and exponent for the casting section and trial riser.
  • This is a formula-only foundry screen. Feeding distance, shrinkage, chills, gates, riser necks, alloy behavior, mold practice and simulation/production trials still control final casting design.