Mechanical power carried by the chain.
Pitch diameter of the sprocket being checked.
Sprocket rotational speed.
Multiplier for shock, duty cycle and uncertain loading.
Allowable working load or rated working tension for the selected chain.
4.775 kN · 1,073 lbf
Effective pull multiplied by service factor.
Also computed
3.183 kN · 715.6 lbf
F = P / v.
v = pi*D*n/60 at the pitch line.
T = F*D/2.
Design pull / allowable chain load.
Powered by MachineCalcs ↗